|
Step
1:
Final sand floor with a 120-grit screen.
Step
2:
Vacuum floor thoroughly to remove all dust.
Step
3:
Thoroughly tack floor twice with clean lint-free towels slightly moistened
with Waterless Cleaner (#1130). Be sure to
rotate and change tacking towels often.
Step
4:
Inspect floor. It should be dust-free. If dust is still present, re-tack
the floor.
Step
5:
Apply one coat of OMU Wood Seal (#230) according
to label directions. Allow it to dry for 12 hours under normal conditions
- longer under humid conditions.
Step
6:
Lightly sand the floor with previously used 120-grit screen or #2 steel
wool pad.
Step
7:
Vacuum floor thoroughly to remove all dust.
Step
8:
Thoroughly tack floor twice with clean lint-free towels slightly moistened
with Waterless Cleaner (#1130).
Step
9:
Mark game lines using 100% alkyd enamel paint. Allow paint to dry for
12 hours. For game line details, refer to MFMA
web site.
Step
10:
Lightly abrade game lines according to paint manufacturer's directions
and then tack as indicated above.
Step
11:
Apply two coats of High Solids Gym Finish (#234)
or three coats of 40% Gym Finish (#293) if
using oil-modified products. If using water-based finish, apply three
coats of Sport Kote®(#222).
Consult labels for complete finishing details, dry times and facility
downtimes.
Step
12:
Let the floor dry completely before applying finish.

|
|






|