High Solids Gym Finish
    Products | Equipment | Product Systems | Technical Help

Training Aids | Sales Support


     

Comply™ Gym Finish
350 VOC-Compliant OMU (232SF)

Features | Properties | General Directions

Application Hints | Packaging Specifications |
MSDS

 
 


Features

  • Oil-modified urethane finish.
  • Meets strict federal and state guidelines (350 grams/liter) for VOC content.
  • Low color, high gloss film provides beautiful, rich appearance without
    darkening wood.
  • Durable finish designed for high traffic gymnasiums, racquetball and squash courts, dance floors and other wood surfaces.
  • Low viscosity formula provides smooth application with a variety of applicators.
  • High shine formula resists scuffs, rubber marks and dirt penetration.


 
 
 
         


Properties*

  • Type - Oil-Modified Polyurethane
  • Form - Clear Liquid
  • Odor - Characteristic Urethane
  • Color - Light Amber
  • Weight per Gallon - 7.95 Lbs.
  • pH - N/A
  • Floor Solids - 52%
  • Coverage - Up To 500 Sq. Ft. Per Gallon (12 m2 per liter)
  • Slip-Resistance - UL Classified
  • V.O.C. Content - < 350 gm/l

* Properties are typical and subject to usual manufacturing tolerances.



General Directions**

For maximum user safety and proper drying, always provide adequate exhaust while using this product.

New Floors or Newly Sanded Floors:

  1. Pick-up all dust and debris with vacuum. Follow with tack rag treated with Waterless Cleaner (#1130) to pick up all remaining dust.
  2. Apply finish with lambs' wool applicator or weighted T-bar. Avoid puddling finish on floor. Spread at a coverage rate of 500 square feet per gallon.
  3. Allow floor to dry for 8 to 12 hours under normal conditions (24 hours max.). DO NOT recoat if finish is tacky.
  4. Abrade finish with a #2 steel wool pad.
  5. Tack with a rag treated with Waterless Cleaner.
  6. Apply game lines. Allow game paint to dry to heavy touch. Lightly abrade game lines according to paint manufacturer's directions, then tack as indicated above.
  7. Apply second coat of Comply™ in the same manner as the first. Allow to dry for 8-12 hours (24 hours max.), then abrade with a #2 steel wool pad, and tack as indicated above.
  8. Apply third coat of finish. Allow 72 hours before opening floor to light foot traffic and 7 days before opening to normal athletic activities or heavy traffic.

Recoating Existing Finish:

  1. Remove all tape, labels and gum from floor.
  2. Dust mop floor.
  3. Abrade floor using 120 grit screens (wet method can be used, if desired).
  4. If using wet method, make sure floor is thoroughly rinsed and completely dry before proceeding.
  5. Tack rag floor with lint-free towels and Waterless Cleaner.
  6. Apply finish as indicated in step 2 under New Floors or Newly Sanded Floors.
  7. If two coats are desired, abrade with #2 steel wool and tack rag with lint-free towels and Waterless Cleaner. DO NOT recoat if first coat is still tacky.
  8. Allow 72 hours before opening floor to light foot traffic and 7 days before opening to normal athletic activities or heavy traffic.

** See label directions and MSDS for complete usage and safety instructions.



Application Hints

  1. Under high humidity and high temperatures, dry times for Comply™ Gym Finish will vary greatly. Do not apply a second coat if the first coat is still tacky.
  2. For best results, apply finish at room temperature. Product applied under
    60°F will become viscous and not flow properly.



Packaging Specifications

Package
Sizes
Available

UPC Codes

Pack Size
(inches)
Cube
(ft.)
Pack
Wt.
(Lbs.)
Full
Pallet
5 Gallon
Metal Pail
783366232055
12 x 14
1.17
43.71
36